PROJECTS

65ad7e7b88d4b449451903
High-voltage-substation
WhatsApp Image 2023-01-21 at 08.05.57
IMG-20220630-WA0014
default
previous arrow
next arrow

BUENTONO

PROJECT

The metro energy project included three works of different dimensions, such as the good tone substation, the subway line and the SF6 substation.

In this work different constructions were carried out such as:
- Milan Wall
- Deep foundations
- The metallic structures of the SF6 building
- 4 power transformers of 60Mva
- Ventilated polymer concrete façade

In charge of the work:

- Architect Joan Valdivia
- Engineer Ricardo Lara

1366_2000
BMW-2021-PlantUpdate-Aerial-0004-1-1920×700
previous arrow
next arrow

BMW PLANT

PROJECT

The substation and control house were built for this project. The equipment was supplied and assembled and put into operation.

nissan-1-2-opt-696×391-1
preview-928×522
previous arrow
next arrow

NISSAN PLANT

PROJECT

The project consisted of 1 subway 115kv line and the expansion of the substation inside the plant.

L3-TREN_LIGERO_GDL-2020-_P†gina_09
L3-TREN_LIGERO_GDL-2020-_P†gina_14
previous arrow
next arrow

L3 LIGHT TRAIN

PROJECT

The project for line 3 of the city of Guadalajara included the low voltage works. The lighting power supply for the stations and inter-terminal sections was made.

Slide
Photo1237
tires-bridgestone
previous arrow
next arrow

BRIDGESTONE

PROJECT



The subtearan line was built, consisting of an open pit excavation and the installation of a duct bank for 2 circuits that connected a CFE substation to the internal substation.